Planning nonprehensile manipulation through contact, in the plane: what is built, how it works, and what is still open.
This section describes the planar (x–z) version of the block-over-a-step problem, built in ccg on the branch master of RobotControlLab/certified-contact-graphs. The pages are organized by topic and describe the current state; the open work is on Issues.
The problem
A disk pushes a square block over a step: the block slides on the floor, tips onto its corner against the riser, rests on the step corner, and lands on the platform. Each phase uses a different set of contacts with the environment, so a planner has to choose which contacts to make and break, in which order, and then find a motion for each change.
The approach
- Contact states. A state is a set of principal contacts in the sense of Xiao and Ji, recognized from a simulated pose with small tolerances.
- Edits. Neighboring states differ by making, breaking or shrinking one contact; several change at once only when no single change is possible.
- The hold gate. Before any motion is computed, a small linear program checks that the contacts which persist through an edit can hold the block, at a pose where the edit can happen. Background: deciding support derives the test from first principles. Certifying a whole box decides it for every pose in a box of poses or disk placements at once.
- The local solver. A realizer (Λ) tries to realize each edit that passes the gate in simulation. The dynamic realizer is the plan to replace the current one with a realizer that plans the motion with its contact dynamics and certifies what is executed. Certified funnels chain certified transitions edge by edge, including a landing in motion.
- Node identity and search. A search over edits, ordered by a ranker and a value estimate, so that few expensive Λ calls are needed.
Where things stand
| Part | What | Status |
|---|---|---|
| Contact states | planar scene, principal contacts, recognizer | Built (Xiao–Ji construction) |
| Edits, the hold gate | validity from geometry, transfers, compound edges; the LP gate with motor limits, the transition sweep and a certified margin; makes and transfers close the added contact | Built; the gate certifies holds only (Theorem B’s level) |
| Certifying a whole box | interval certificates over boxes of poses; stick–slip plans and Theorem S; the indirect lift’s last four edits and closing transport certified over the friction band | Built; certified placement in the code behind a flag (off) |
| The local solver | the success test, the quasi-static realizer Λqs with its six default options; a stick–slip variant (off) | Built; Λqs realizes every edit of the indirect lift; its plans are sequences of held poses |
| The dynamic realizer | a certified tube per edit (B-tube) with a fixed-mode MPC tracking inside it (A-tracker); learning only as a clipped residual | Planned; the architecture is adopted, nothing is built |
| Certified funnels | a certified transition per edge (entry set, law, tube) over the friction band, checked in MJX; a chain with a landing in motion; zonotopes for the impact window; an energy (dissipation) certificate for the rest after the impact; a certified goal stop and release | Built and certified end to end (track C, wide transport): 14 of 14 segments and 16 of 16 junctions certified; 1536 of 1536 MJX rollouts reach the lift goal, released and at rest |
| Node identity, search | node keys and merging; PHS* with outcome children and block transports; the value 𝒱₀, a learned V₁ and ranker π | Built and run; from the scene alone (unhinted) it finds the held indirect lift in 199 of 200 held-out searches |
The current configuration: disk–block friction is a declared band μdisk ∈ [0.3, 0.5]; the gate and the tracker use 0.3; every edit is realized by Λqs with its default options; release edits and the learned skills are in the code but off (the local solver). The indirect lift’s last four edits and its closing transport are certified for every μ in the band (Certifying a whole box). From the scene alone, the planner finds the held indirect lift in 199 of 200 held-out searches (99.5%; 34 of 34 on the original test set) with a learned V₁ and ranker π (192 calls each; every disk-placed edit offered at each placement with a distinct transition pose, Λqs’s three contact rules on, admissible transition poses, δ-eroded transport targets, the block’s rotation over ±180°, EULERDAMP disabled; Results).
Videos of the planner’s motions are on Results. Open work and known defects are on Issues.