1. What a funnel is
Intuition. A feedback law steers the box along one piece of the plan (one edge: a single contact formation with fixed stick or slip modes). A funnel is a certified tube around the planned motion: every state that starts in its entry set stays in the tube and leaves through its exit set, for every disk friction in \([0.3,0.5]\) and every disturbance in a measured set [1], [2], [3].
Check it by hand (a toy). A rate error \(\eta\) obeys \(\eta_{k+1}=0.5\,\eta_k+w_k\) with \(|w_k|\le0.1\). Entry set \(|\eta_0|\le0.2\). Then \(|\eta_1|\le0.5\cdot0.2+0.1=0.2\): the interval \([-0.2,0.2]\) maps into itself, so it is a tube for every step, and any condition that holds on it holds along the whole motion.
The general statement. The certificate checks, by interval or zonotope arithmetic on the rigid model, that one step of the planned mode carries every state of each band of the tube into a later band or the exit set, and that at every such state:
- every closed contact carries a normal force of at least the derived force floor \(N_{\min}=2\times10^{-4}\) N, the simulator’s measured one-step contact-force residual at its joint 95/95 bound;
- every force lies in its friction cone (sliding contacts on the edge opposite the slip, sticking ones strictly inside an inner cone);
- the motor forces lie in their box;
- the recognizer reads the planned formation with margin.
The executed motion is then checked in MJX on held-out rollouts.
2. Utilization: how much room is left
Intuition. Each condition has a margin: how far the worst state in the set is from violating it. Utilization is the certificate’s smallest remaining margin as a fraction of its capacity. 1 means untouched, 0 means at the limit: higher is safer.
Check it by hand. A friction cone allows \(|f_t|\le\mu f_n\). If over the whole tube \(|f_t|\le0.6\,\mu f_n\), that condition’s utilization is \(1-0.6=0.4\). If another condition’s is \(0.25\), the certificate’s utilization is \(0.25\), set by the tighter one, its binding condition.
In our chain. The roll from \(62^\circ\) is certified at 0.376, bound by the step corner’s cone edge; the platform transport at about 0.21, bound by a force floor.
3. Choosing a law: coverage first, then utilization
Intuition. First make sure the law handles every state it must (coverage); among those that do, take the one with the most room (largest utilization). Coverage is judged for the chain, not the edge alone.
Check it by hand. Three push magnitudes after the roll, each certified on \(2\times8\) sub-boxes of the roll’s certified exit set (a single tube over the whole exit set is refused at every magnitude):
| push | sub-boxes certified | utilization |
|---|---|---|
| 0.0538 N | 16 of 16 | 0.488 |
| 0.1116 N | 16 of 16 | 0.686 |
| 0.2316 N | 16 of 16 | 0.316 |
All three cover the roll’s exit; 0.1116 N has the largest utilization and is chosen, provided its landing also passes (next paragraph).
Why coverage is the chain’s. A push counts only if the landing after it also comes to rest in the planned formation, because a stronger push lands harder. The landings after the 0.1116 N push hit the platform at 34.5–35.5°/s; with the ray-0 roll’s 0.02531 N push they hit at 13.7–17.9°/s. Both came to rest in every MJX rollout (1536 of 1536), so both pass the chain’s coverage test.
4. Composition: on certified sets only
Intuition. Two funnels chain when everything the first can deliver is something the second has been proved to accept. Both sides must be proved sets.
Check it by hand. Funnel A’s certified exit is \(\eta\in[-0.05,0.04]\). Funnel B’s certified entry is \(\eta\in[-0.06,0.06]\). Since \([-0.05,0.04]\subseteq[-0.06,0.06]\), the junction composes. If B’s entry were only measured, say the 95/95 region of the speeds MJX happened to produce, it would not count: a measured set describes what was executed, not what is guaranteed.
The general statement. A junction composes [1] when the exit set certified for one edge lies in the entry set certified for the next (the next funnel’s bands re-verified from it). Measured entry sets are subsets of the executed states and are used only to validate coverage; composition is established on certified sets. The end-to-end claim is the per-certificate claims combined by a union bound: with \(m\) certificates each holding except with probability \(\alpha_i\), the chain holds except with probability at most \(\sum_i\alpha_i\), with the measured end-to-end coverage reported alongside.
The automatic check, and a cascade
A script, chain_check, reads each junction’s exported set records and passes it only if the certified exit lies inside the certified entry, compared exactly. A measured set fails as FAIL (measured), a missing record as FAIL (missing), and a NaN never passes.
A cascade. Re-certifying the tip from its departure’s certified hand-off widened the tip’s exit by about \(10^{-5}\) rad/s: \(|\eta'|\le0.036055\) against the pivot’s certified entry \(0.036045\) rad/s, and \(0.200\) mm against \(0.182\) mm in the disk’s place. That is outside, so the pivot was re-verified from the new exit (it holds, utilization 0.228), and the stop after it was re-certified from the pivot’s new exit. A one-line change at the start of the chain forces every downstream junction to be re-checked, which is exactly what an automatic check is for.
“Inside the band” is not “a certified entry”
Landing inside a funnel’s certified bands does not by itself make a certified entry: the bands are proved invariant only for states that enter through the funnel’s entry set. A departure that ends in the bands but outside the entry set needs the funnel re-verified from that departure’s exit. Until then, chain_check fails the junction.
Asymmetric entry sets
Intuition. A box entry set is symmetric about its centre. If the motion only goes forward, a symmetric box admits states that go backwards, which no real departure produces, and the certificate refuses them.
In our chain. The floor-corner lift’s departure hands off at a tilt rate within \([-0.0039,+0.0286]\) rad/s of its target of 1°/s (0.0175 rad/s). A symmetric entry of \(\pm0.0286\) rad/s includes rates below \(-0.0175\) rad/s about the target, i.e. tilting backwards, and the funnel refused it (no progress). Re-verified from the asymmetric entry, it holds (utilization 0.267).
5. Measured quantities: joint 95/95 bounds
Intuition. A certificate needs bounds on what the simulator does that the rigid model does not (residual accelerations, creep, settling). Bounding each quantity separately at 95/95 does not give 95% coverage of the whole certificate, because a rollout must lie inside all bounds at once.
Check it by hand. Five independent quantities, each inside its own bound 95% of the time: all five at once only about \(0.95^5=77\%\) of the time.
The general statement. One joint region, built from order statistics [4], [5]: each quantity is centred at its median and scaled by its own order statistic on half the calibration rollouts; one common inflation is the order statistic of the largest scaled deviation on the other half. It covers at least 95% of rollouts in all quantities at once, with 97.5% confidence per end of the friction band (so both ends hold at 95%). On the tip, per-quantity bounds covered 882 of 1000 held-out rollouts jointly; the joint region covered 963.
Bound each quantity where it lives. Charging the largest creep measured anywhere to every contact point over-bounds the contacts that barely move. On the roll from \(62^\circ\), the disk’s place on the bottom face creeps up to 2.39 mm in MJX, the largest creep of any contact. Charging 2.39 mm to the step-corner contact as well made the first band’s lower bound on progress per step \(-2.9\times10^{-5}\), a refusal; with each contact’s own creep it is at least \(1.37\times10^{-4}\), above the \(3.49\times10^{-5}\) one band needs, and the roll certifies. Each contact carries its own bound inside the joint region.
The rigid-versus-simulator gap is a measured disturbance. After the make under the bottom face, MJX’s box settles \(+0.473\) to \(+0.489^\circ\) in tilt (and \(+0.885\) to \(+0.907\) mm in the step corner’s place) relative to the rigid model’s rest. That settle enters the next departure’s start set as a measured joint 95/95 region.
6. Execute end to end, not just segment by segment
Intuition. Checking each segment in its own simulation, from states saved by the previous one, can miss what happens between segments and whether the whole chain reaches the task’s goal.
In our chain. One continuous MJX simulation per rollout, 1536 rollouts from the box at rest to the platform transport’s exit: every segment survived in all 1536, and the chain’s own goal was reached in all 1536 (Clopper–Pearson [6] 95%: \([0.9976,1]\)). But the executor also evaluates goal tests that no segment check looks at, and the stricter one, lift_to, was met in none of the 1536 runs: the platform transport’s certified exit lies at 42.07 mm along the platform, short of where that test passes. A transport certified on to 62.4 mm, the first section passing the lift goal test (utilization 0.2083, 757 of 757 held-out rollouts inside), is the edge that addresses it.
What to remember
- A funnel: entry set, law and tube, a certificate (force floor, cones, motor box, reading condition) on the rigid model, checked in MJX.
- Utilization: the smallest remaining margin as a fraction of capacity; 1 untouched, 0 at the limit, higher is safer.
- Choose by coverage of the whole chain first, then the largest utilization.
- Compose on certified sets only; measured sets validate coverage; the end-to-end claim is a union bound over certificates.
chain_checkmakes the containment automatic; a change upstream cascades downstream.- Inside the band is not a certified entry; prefer asymmetric entry sets for one-directional motion.
- Measured quantities as joint 95/95 regions, per contact, including the rigid-versus-simulator settle.
- Execute end to end: it finds gaps that segment checks miss.
Further reading
- Burridge, Rizzi and Koditschek [1]: the classic on sequential composition of funnels, where “exit inside the next entry” comes from.
- Tedrake et al. [2]: LQR-trees, funnels verified by sums of squares and composed into a tree.
- Majumdar and Tedrake [3]: funnel libraries composed online, with robustness to disturbances.
- Sadraddini and Tedrake [7]: linear encodings for the containment checks a junction needs.
- Wilks [4]: distribution-free tolerance limits from order statistics, the basis of a 95/95 bound.
- Krishnamoorthy and Mathew [5]: tolerance regions in depth, including multivariate and nonparametric ones.
- Clopper and Pearson [6] and Wilson [8]: exact and score confidence intervals for a success rate such as 1536 of 1536.
- McNemar [9]: the paired test used to compare two configurations on the same starts.